A used machine's operating footprint can fit a proposed bay while its transport sections still cannot pass through the entrance. For a UK site with restricted access, ask the seller for the transport envelope of each section and have the responsible site team check the entire route.
Start at the road and end in the operating bay
Record approach restrictions, offloading space, door dimensions and all changes of direction. Note whether the delivery uses the same access as production, staff or returning pallets. Ask the carrier and installer to identify which permissions, temporary removals and lifting arrangements they will handle. Give unknowns a named owner and date.
| Route point | Measure or evidence | Who confirms |
|---|---|---|
| Vehicle approach and waiting | Delivery address, time and restrictions | ___ |
| Unloading position | Transport weight, envelope and ground assessment | ___ |
| Narrowest door or turn | Measured clear dimensions and geometry | ___ |
| Interior route | Floor, slopes and temporary obstructions | ___ |
| Operating bay | Final positioning and maintenance envelope | ___ |
Put transport section drawings alongside the route plan before comparing quotes. Agreement on delivery to the site and agreement on final positioning can cover different scopes. Put both in the comparison.