For a UK whisky project, send the closure and bottle finish drawings before booking a used machine demonstration. Identify how the closure will be supplied, fed and inspected. Ask what trial fluids and operating conditions the site can safely support and what conclusions can be drawn from that run.
Keep samples linked to the machine configuration
Bring closures from the planned supply and bottles representing each relevant finish. Record fitted parts and retain approved closed samples. Ask the packaging and machine suppliers how they will assess fit, appearance and handling, including a restart. Review the actual production conditions with the site team.
| Check | Reference | Observed result |
|---|---|---|
| Bottle and closure assembly | Drawings and package sample ID | ___ |
| Feeder and fitted tools | Parts list and material lot | ___ |
| First accepted bottle | Closure result and line rate | ___ |
| Trial boundary | Conditions witnessed and work outstanding | ___ |
Carry the sample trial evidence into the UK delivery scope
Discuss a whisky bottle closure trial
Send closure drawings, bottle format, UK site and proposed rate.