Give the contract packer two representative short orders before discussing equipment. Include the drinks, containers, closures and artworks, along with the actual batch sizes. Ask who supplies materials and how unused items or part batches are released.
Use the handover between two real jobs
Request the record that identifies last good pack, material change, first accepted pack and elapsed setup. Use agreed production conditions and hold responsibilities. Include order variation and output on the same basis when comparing machines.
| Brief field | Order A | Order B |
|---|---|---|
| Container, cap and artwork | ___ | ___ |
| Order quantity and date | ___ | ___ |
| Setup and first accepted sample | ___ | ___ |
| Unused stock or rework disposition | ___ | ___ |
If your 3,000-unit run needs 120 packs to reach first approval, those packs represent 4% of the order before any later rejects. Ask the co-packer whether the 3,000 are the number started or the quantity released and who supplies the extra packaging. Put both the answer and the agreed pack-count evidence in the brief.