Independent checklists for inspection, comparison, relocation and commissioning. This guide is written for UK beverage manufacturers and contract packers and should be adapted to the actual machine and production project.

01

Verify identity and scope

Match serial plates, year, manuals, electrical drawings and the seller’s equipment list to every module offered.

For Used Bottling Machines UK, pay particular attention to project fit, UK delivery and technical due diligence.

02

Inspect condition

Check wear parts, lubrication, bearings, product-contact areas, safety systems, controls, obsolescence and visible modifications.

For Used Bottling Machines UK, pay particular attention to project fit, UK delivery and technical due diligence.

03

Test with evidence

Whenever possible run the equipment with representative product and formats, recording speed, rejects, alarms and changeover requirements.

For Used Bottling Machines UK, pay particular attention to project fit, UK delivery and technical due diligence.